英语翻译Directional-Drilling Sidetrack:A-6 AH:7315 to 8348 m.The well path was followed as planned,with a maximum DLS of 5.7°/30 m in the kickoff section and 68° inclination throughout the Draupne formation.It was found that the Draupne formati
来源:学生作业帮助网 编辑:作业帮 时间:2024/11/19 15:05:06
xXYSW+2UIU#)WH]TձtL