英语翻译To monitor the change in stress over ribs against the slice,two stress meters GSC1 and GSC2 were installed in two pillars in such a way that they came almost in the centre ofthe rib after splitting and slicing of the pillar (Fig.1).Monito
来源:学生作业帮助网 编辑:作业帮 时间:2024/07/18 19:41:55