英语翻译4.2 ElectricityThe electricity load is classified to grade 2 according its nature.Based on local power network,one transformer station is to be set up toproduce alternative current with 3 phaes/4 line 380 v.Two diesel generator are for em

来源:学生作业帮助网 编辑:作业帮 时间:2024/12/04 17:15:54
英语翻译4.2 ElectricityThe electricity load is classified to grade 2 according its nature.Based on local power network,one transformer station is to be set up toproduce alternative current with 3 phaes/4 line 380 v.Two diesel generator are for em
xV]o+GT`T*B!-UEIɌ 5rb/՛ɲ7mct3, QNj) +LcJ:\%u"!% E Dد<H_{Xc@Xr+Rm\(3sK DQݧ>a[FԽehXcjƀLJђi#ϰc\rHP`4h7%pq(exLGj`-uσx/X ab#d 5%>;HebC-Lˋ֣T^* )v!m#*1q:ɉKn5yw<6DGLz-5A+@BMHJyQ]X-$!&|g`CR oW]AJ)TǗڿaXX2XĎ2 h&Szp%^FWgÎjAW>hOu%><{כ=+<{v5U&?|/z=T· *U#ZlE2@l?~õ෶W` (GAy{wpj.o/rxΫ+ѫ=Pxod'o pwg?ND <ÅN;j[/ ߥฒKbt/> whIGԡk-a7o?P)ysV5*o2qt"|݉>Tܥ𽦼`{:ǧG7f;LF~>=ƌ{@vI~ s8nIǑ? ʫߊ{"Co/[ g5ۛكpPT|o;y`7|"Zx)q1@dGh*T+ڽ+/J̈́TXjGXU>kM_ q)BkVD"AUC0t$^$D܂m HեO>Ek7YfoI|h| ٓhU O[u?G@4h*BMz9T"IuM; hd

英语翻译4.2 ElectricityThe electricity load is classified to grade 2 according its nature.Based on local power network,one transformer station is to be set up toproduce alternative current with 3 phaes/4 line 380 v.Two diesel generator are for em
英语翻译
4.2 Electricity
The electricity load is classified to grade 2 according its nature.
Based on local power network,one transformer station is to be set up to
produce alternative current with 3 phaes/4 line 380 v.Two diesel generator are for emergent uses.
4.2.2 List of Main Electrical Applications
To be worked out according to process requirements.
4 .2.3 Thunder Grounding
All the constructions in the factory require groundings.Power supply and transforming system are 380/220v alternative,3-phase and 4-line system.Duplicated grounding will be applied for power inlets with a transmitting distance more than 50 m,grounding resistance less than 10  ,while that for other constructions are less than 30 &
.
4.3 Auto Control and Instruments
Indicating instruments are applied for the factory according to process requirement.
4.4 Air Conditioning and Ventilation
7.4.1 Air conditioning
Since the weather is hot,most constructions are applied with air conditioning systems except warehouse,garage and shanties.
7.4.2 Ventilation
Mechanic ventilations are applied for product warehouse and other places where required
4.5 Communication,
Computer Network and Monitoring System to be in conformity with the production flow and the advanced management,combination of wire and wireless communication principle is applied in order to assure normal communications.Wiring of the communication will be arranged together with the computing local wiring network in the factory.200 telephone set will be installed.
Most of the rooms in the administration building as well as the living room and duty room will be equipped with one telephone set (total 50 telephones),while in various working areas,10 walker-talkers are applied.To be in conformity with the production flow and the advanced management,local computing network with relative number of computers will be applied.In order to monitor in timely the process flow situation,a computer monitoring system with 10 probes and 1 monitoring center is planed to set
4.6 Repair Facilities
The factory is designed to be a medium sized enterprise and therefore,main task of the repair shop is to solve any mechanic problems appear in the process flow.
Machinery repairing shop,tools room with common tools,test instrument and necessary repair equipment will be built in the factory.
4.7 Workshop Labs and Central Lab
Labs will be set up in relative shops for timely quality control in the process flow.
1 central lab will be set up to control and assure quality of the final product.

英语翻译4.2 ElectricityThe electricity load is classified to grade 2 according its nature.Based on local power network,one transformer station is to be set up toproduce alternative current with 3 phaes/4 line 380 v.Two diesel generator are for em
4.2电力
在用电负荷分类为2级根据其性质.
根据当地的电力网络,一台变压器要成立
生产替代3 phaes / 4线380柴油发电机目前两案正在接受紧急用途.
4.2.2电气主应用程序列表
要制定按工艺要求.
4 .2.3防雷接地
所有在工厂建设需要搁浅.电源和转化系统的380/220v替代方案,3相和4线系统.重复接地将应用于电力口与传输距离超过50米,接地电阻小于10,而对其它建筑小于30&
.
4.3自动化控制及仪器
指示仪器应用于工厂按工艺要求.
4.4空调及通风系统
7.4.1空调
由于天气炎热,大部分建筑与空调系统,除了应用于仓库,车库和窝棚.
7.4.2通风
技工通气应用于产品仓库和地方规定的其他地方
4.5通信,
计算机网络及监控系统,以符合与生产流程和先进的管理,有线和无线通信相结合的原则是适用于以保证正常通信.在通信线路将被安排一起计算在工厂本地线路网络.200电话集将被安装.
大多数在行政大楼的房间以及客厅和值班室将配备一台电话(共50个电话),而在各个工作领域,10个学步车,健谈的应用.为了符合与生产流程和先进的管理,与本地计算机的相对数量计算网络将被应用.为了及时监测过程流动情况,一台计算机和1 10个探头监控中心是刨设置监控系统
4.6修复设备
该工厂的设计是一个中小型企业,因此,该维修店的主要任务是解决任何机械问题,在这个过程中出现流.
机械修理店,工具,常用工具,测试仪器和必要的维修设备室将建在工厂.
4.7车间实验室和中心实验室
实验室将设立在流动过程中的质量控制相对及时商店.
1个中心实验室将设立控制和保证最终产品的质量.