英语翻译请精通英文的人帮忙翻译成英文,合适了就加40分以下为要翻译的全文,4.1阀门应存放在干燥通风的室内,严禁堆迭放置,温度宜保持0~35℃之间,相对湿度为50~80%之间.4.2库存阀门的两端必

来源:学生作业帮助网 编辑:作业帮 时间:2024/11/23 21:31:09
英语翻译请精通英文的人帮忙翻译成英文,合适了就加40分以下为要翻译的全文,4.1阀门应存放在干燥通风的室内,严禁堆迭放置,温度宜保持0~35℃之间,相对湿度为50~80%之间.4.2库存阀门的两端必
xVrޤ&9=q\JY$J CnHIzdYh=l{q{5nԞa1ژ< ]i:ͮ-M&;-޽bv:ayD:/MYK8݌?扸z39DmvGu7OqnpҢ+=f-NMW`#WUGݟQtאP%'F?ڢxwZ$1H4o*Y], |#'shKXk nx} `]O&Oe.쬃HRbY\ {h\d6D V ȷC̪8߁a<QlDb&. +YsY{5lE /Ao:#}J=h-Vf5PAM OI}4Hl%9셝Eq \@? *)"S@Ud`#&PݥAswP M,Q!ʰ׋ÛEYq obyAFb$o`%x, KO>j\bK u~%2)J[dE w[h*4NɒM0)P)+fjPEɦ44CU}YvʔZ;dnJ%ψ3<R ;D,:u {4 +0'Z; dCL:KD] O}-PPEs6Gj?kuAXaϾ B?oK>`KS9IعcbL ǰ 8*D9yCan?Q@lIᏏ'D{l}shOr/y-NM+ztyVhg18ͳH4/ Wof#\[PR(SFO/m`]"t, ][4آ ]NIfM%gxA|@rf~3G>D@+Բμ&f{MFsB0g"zw<ʢ7Yo2 DcF$$Y=h=O`R*0֓_ ]OdÂrSK3_r:7O #M~fE6n  L2@]oM⋰nzX񂟣pQW,;Jy[ p",Z-hF6Q.A$s2D& % tFA'^1I"y\QU : T6yA&5*Ke[2mh/\۲}B癫R ˬ<ˆVѫ jJJwƱV2q RxmH2sߏ,81d4Z.;Ca y󯺥u1I1pەKƏ*X9]W§Cj gqo! +\'m>$_P;|ZFAaܑa&ۦj%C7a{PWZR3^4Pd"Vr1RDP"eM{K RÜ*ttLŻ=- LSw1h W,п(IdUR`u<1% U[P"aVꢴ7nxoj:y_Q-Іwǐ%ph#+&}gHy2;O) dA&gj(ˋtXi`#P֦r`yE@g{ʀ*#L(vc Zo3Gu)4d7^PN SVI|LY(u«=8*jQDL7T]HF%k 2i, =EE>n}1 P4|`zn=ކ

英语翻译请精通英文的人帮忙翻译成英文,合适了就加40分以下为要翻译的全文,4.1阀门应存放在干燥通风的室内,严禁堆迭放置,温度宜保持0~35℃之间,相对湿度为50~80%之间.4.2库存阀门的两端必
英语翻译
请精通英文的人帮忙翻译成英文,合适了就加40分
以下为要翻译的全文,
4.1阀门应存放在干燥通风的室内,严禁堆迭放置,温度宜保持0~35℃之间,相对湿度为50~80%之间.
4.2库存阀门的两端必须封口,以防异物进入内腔而损伤密封部件.且应避免与油类或其它易燃物品接触.
4.3阀门的金属加工表面应清除污垢,并涂以防锈剂.
4.4安装前,应仔细核对管路的运行条件是否与本阀规定的适用范围相符,避免因选用不当而造成不必要的损失
4.5本阀除不宜应用于真空管路外,可在管路的任意位置安装作双向流动.当阀门处于卧装位置时,应在其装置下端加置支架加以固定,并应确保操作和维修的方便.
4.6安装时,应将阀门内腔清洗干净,防止污垢卡阻或异物损伤密封部件.并检查各部件连接螺栓是否均匀紧固.
4.7运行中应经常检查与介质接触的部件,并按实际使用情况或运行周期,定期更换密封圈.(密封圈橡胶老化时间一般二年左右)
4.8 正常使用的执行机构平时要进行适当的维护.进入汽缸的压缩空气必须经过过滤器.要定期观察油雾器的油位,油位降低要及时加油,以保证润滑油不断地进入汽缸,对汽缸内的运动部件进行良好的润滑.在整个供气系统的始端应设置排水装置,并定期将压缩空气中的水分排尽,以保证压缩空气干燥.
4.9 如应用于间断性的管路上,则在停用期间,应清洗与介质接触部位,以延长阀门的使用寿命.
4.10 经检修后的阀门,在应用前需按有关测试规定进行密封性试验,合格后方能安装使用.并做好维修记录以备查考.

英语翻译请精通英文的人帮忙翻译成英文,合适了就加40分以下为要翻译的全文,4.1阀门应存放在干燥通风的室内,严禁堆迭放置,温度宜保持0~35℃之间,相对湿度为50~80%之间.4.2库存阀门的两端必
4.1 valves should deposit in the dry well ventilated indoor,refuses to pile the repeat laying aside,the temperature maintains suitably 35℃,the relative humidity is between 50~80%.4.2 keeps in stock valve's both sides to the seal,enters the cavity by against foreign matter to damage the seal part.And should avoid with the oil class or other combustible materials contact.the 4.3 valve's metal working surface should eliminate the dirt,and spreads by the rust-preventing agent.before the 4.4 installment,should check pipeline's operating condition carefully whether to stipulate with this valve the applicable scope match case,avoids because of selecting improper causes nonessential loss 4.5 this valve besides not to be suitable applies in the vacuum line,may pretend the two-way flow peacefully in pipeline's optional position.When the valve is in lies installs the position,should in it install lower extremity Canada to set at the support to fix,and should guarantee the operation and service convenient.when 4.6 installs,should be clean the valve cavity clean,prevents the dirt card anti- or the foreign matter damage seal part.And inspects various parts connecting bolt whether to fasten evenly.in the 4.7 movement should inspect and the medium contact part frequently,and according to the actual service condition or the movement cycle,replaces the seal packing collar regularly.(about seal packing collar rubber aging time general two years) the 4.8 normal use's implementing agency usually must carry on the suitable maintenance.Enters cylinder's compressed air to pass through the filter.Wants the regular observation oil mist oil level,the oil level to reduce must refuel promptly,guaranteed that the lubricating oil enters the cylinder unceasingly,carries on the good lubrication to cylinder's moving part.Should establish the drainage system in entire air-supply system's beginning end,and in compressed air's moisture content will drain away regularly,guaranteed that the compressed air is dry.4.9 like applies on the discontinual pipeline,is stopping using the period,should clean and the medium contact spot,lengthens valve's service life.4.10 after the overhaul valve,must carry on the leakage test before the application according to the related test stipulation,after the qualified,side can install the use.And completes the maintenance records to prepare the investigation.