英语翻译这个测试的结果有时候是看机率的,现阶段我们无法100%保证每次都可以pass.如果一定要调整修改,我们需要修改尺寸和泡沫,但需要1个月的时间来准备整改.所以对于1月份的订单,现在我
来源:学生作业帮助网 编辑:作业帮 时间:2024/11/28 21:14:46
英语翻译这个测试的结果有时候是看机率的,现阶段我们无法100%保证每次都可以pass.如果一定要调整修改,我们需要修改尺寸和泡沫,但需要1个月的时间来准备整改.所以对于1月份的订单,现在我
英语翻译
这个测试的结果有时候是看机率的,现阶段我们无法100%保证每次都可以pass.如果一定要调整修改,我们需要修改尺寸和泡沫,但需要1个月的时间来准备整改.
所以对于1月份的订单,现在我需要你们确认给我是否能可以开始采购剩下的物料,不然,我很难赶在Chinese New year 前出货(1月22号后我们不再出货).
英语翻译这个测试的结果有时候是看机率的,现阶段我们无法100%保证每次都可以pass.如果一定要调整修改,我们需要修改尺寸和泡沫,但需要1个月的时间来准备整改.所以对于1月份的订单,现在我
The result of this test sometimes depends on the probability; at the moment,we cannot 100% guanrantee that the test will ne passed every time.If you insist on making adjustment,we will have to alter the size and the foam,and we need one month to get ready.
So regarding the January oder,I need your confimation right now whether or not I can start purchasing the other raw materials.Otherwise,I may nor be able to dispatch the goods before the Chinese New Year (We stop dispatching goods after 22nd Jan).
The test result depends on probability at times.Currently we can't 100% guarantee that it can pass every time.If some adjustment and modification have to be made,we need to modify the size and foam.Bu...
全部展开
The test result depends on probability at times.Currently we can't 100% guarantee that it can pass every time.If some adjustment and modification have to be made,we need to modify the size and foam.But it will take 1 month to prepare for these corrective actions.
Therefore,as for the order of January,I need you to comfirm whether I'm able to commence the purchase of the remaining materials.Otherwise,it will be diffcult for me to deliver before Chinese New year(we will stop delivering after Jan.22nd )
收起
仅供参考:Test result may vary, at this stage, we can not guarantee a 100% pass rate for each test. If you insist us changing it, we can do that along with the foam, which will take around one month to fi...
全部展开
仅供参考:Test result may vary, at this stage, we can not guarantee a 100% pass rate for each test. If you insist us changing it, we can do that along with the foam, which will take around one month to finish.
Resultantly, we need your confirmation to buy raw materials for your order for January, without which we would not be able to deliver all products before Chinese New Year. (Please note that we stop delivering goods after Jan 22. )
收起