4-1/2" SCH40是什么意思?

来源:学生作业帮助网 编辑:作业帮 时间:2024/11/28 05:00:38
4-1/2
xVMk#G+%eqKaY!LI{ݣ=aK~C!gȫч6_zn :4a>׿?ק/=}ۅw°3>8Jt ==-mY-)[ץJxW9 <:>+8K&S:`ԢZctNg<(+{zo3G9[RFj~ϨC'A:]6'FX d&Wi2NIܤɛ''ht@ ;'(o\=M<+Z@=IP&}z JoDZ=K҆qmJh*3mVf ^IcTU9k62NBǷ 7-uGI?8~D\ [YīVyj0T%NlH.RzrуY4Yt 1\ˁ tm:4$ȵ.F=en=n[n `a.uL\!Xh"PRt2"qp8nӖ$m}(йJO>d\&oZӢ XI:35ɝL"k X$hNH9x#xȱpFy›.,X]N+hXqՅ^Cǿɤp)갫q"-0V)F h{ &DJA1.:ga:-`-͚ 9b:Zr%; N!5Hƒpe'4LMk= ZoG(Z;JIGh#6;d hSr4zr>ɸ t .*I4+{^y`kSA8^xt_z$hU@\‘ƇSi 4v{b3d S,GiwJK Wk:^oYv Nvnݡsy}p;2w/?:

4-1/2" SCH40是什么意思?
4-1/2" SCH40是什么意思?

4-1/2" SCH40是什么意思?
Industrial pipe thicknesses follow a set formula,expressed as the "schedule number" as established by the American Standards Association (ASA) now re-organized as ANSI - the American National Standards Institute.Eleven schedule numbers are available for use:5,10,20,30,40,60,80,100,120,140,& 160.The most popular schedule,by far,is 40.Sch 5,60,100,120,& 140 have rarely,if ever been employed by myself in over 40 years as a practicing engineer.The schedule number is defined as the approximate value of the expression:
Schedule # = (1,000)(P/S)
Where,
P = the internal working pressure,psig
S = the allowable stress (psi) for the material of construction at the conditions of use.
For example,the schedule number of ordinary steel pipe having an allowable stress of 10,000 psi for use at a working pressure of 350 psig would be:
Schedule = (1000)(350/10,000) = 35 (approx.40)
This would be the proper schedule for welded joints and steel fittings but not for threaded connections and cast-iron or malleable-iron fittings.In practice,schedule 40 would be used for welded construction and Sch 80 (about 2x the computed value) for iron fittings.The higher schedule is required because of weaknesses the iron fittings and the metal lost in cutting the threads.
For all pipe sizes below 10",Sch 40 pipe is identical with what was once called "standard" pipe,and Sch 80 is identical with the former "extra-strong" pipe.There is no equivalent schedule number for "double-extra-strong" pipe,and Sch 160 is the only other weight in which pipe smaller than 4" is available.
Temperature has no direct bearing on the schedule,except as it either weakens (or strengthens) the material's allowable stress.Stainless steels (304ELC & 316ELC),for example yield a stronger allowable stress at the low temperatures near the cryogenic zone (-50 to -150 oF).Copper and Brass also exhibit the same behavior.I've used the rule of thumb that the softer the metal,the stronger it is at the lower temperatures.