英语翻译请各位帮忙翻译以下模具用英语:1、上模,安装顶出复位杆,打开锁模片2、开模,接运水,行程开关,检查顶出复位3、合模、注射、冷却4、前模油缸抽芯抽出5、开模、顶杆顶出、取件6
来源:学生作业帮助网 编辑:作业帮 时间:2024/11/27 11:54:46
英语翻译请各位帮忙翻译以下模具用英语:1、上模,安装顶出复位杆,打开锁模片2、开模,接运水,行程开关,检查顶出复位3、合模、注射、冷却4、前模油缸抽芯抽出5、开模、顶杆顶出、取件6
英语翻译
请各位帮忙翻译以下模具用英语:
1、上模,安装顶出复位杆,打开锁模片
2、开模,接运水,行程开关,检查顶出复位
3、合模、注射、冷却
4、前模油缸抽芯抽出
5、开模、顶杆顶出、取件
6、合模
7、前模油缸复位
8、开模50-60mm后,马达运动,旋出螺牙
英语翻译请各位帮忙翻译以下模具用英语:1、上模,安装顶出复位杆,打开锁模片2、开模,接运水,行程开关,检查顶出复位3、合模、注射、冷却4、前模油缸抽芯抽出5、开模、顶杆顶出、取件6
1,the mold,installed under the top out of reset,open the film-mode-locked
2,open mold,then water,trip switch,check the top of the reset
3,mold,injection,cooling
4,before the mold core pulling out of the fuel tank
5,open mold,the top out pickup
6,Die
7,the fuel tank before the reset mode
8,the 50-60mm mode,the motor sports,spin out
mold
组合一下就ok
1.On the mold, installed under the top out of reset, open the film-mode-locked
2.open mold, then water, trip switch, check the top of the reset
3.Mold, injection, cooling
4.Core-pulling ...
全部展开
1.On the mold, installed under the top out of reset, open the film-mode-locked
2.open mold, then water, trip switch, check the top of the reset
3.Mold, injection, cooling
4.Core-pulling tanks before taking the modulus
5.Open mold, the top out pickup
6.Mold
7.The fuel tank before the reset mode
8.Open mode after the 50-60mm, motor sports, spin out screw
收起
1, Have mould, installation carry, appear, restore to the throne pole, open, lock mould stretches of
2, turn on mould, answer and transport ink, the journey switch, check and carry appearing and ...
全部展开
1, Have mould, installation carry, appear, restore to the throne pole, open, lock mould stretches of
2, turn on mould, answer and transport ink, the journey switch, check and carry appearing and is restored to the throne
3, it shut by mould, not inject, cool by
4, before release core not to be lasted
5, for mould, carried peak of the staff produced, lasted
6 of pieces, lasted
7 of moulds mould cylinder, before last
8, mould cylinder, motor sports, back-out spiral shell's tooth
收起
1, the mold, installed under the top out of reset, open the film-mode-locked
2, open mold, then water, trip switch, check the top of the reset
3, mold, injection, cooling
4, before t...
全部展开
1, the mold, installed under the top out of reset, open the film-mode-locked
2, open mold, then water, trip switch, check the top of the reset
3, mold, injection, cooling
4, before the mold core pulling out of the fuel tank.
5, open mold, the top UnderTop out pickup.
6, Die.
7, the fuel tank before the reset mode.
8, the 50-60mm mode, the motor sports, spin out Lotooth.
收起