英语翻译打问号的是看不清楚的.12 Holes equispaced to be Pilot Drilled Φ80 together with the Stub Shaft (To be finally reamed to Φ82,55 (3 1 /4") on site assy.)Notes:1.Surface finish (中间是数字)all over &(数字)w?ere show

来源:学生作业帮助网 编辑:作业帮 时间:2024/08/07 10:57:54
英语翻译打问号的是看不清楚的.12 Holes equispaced to be Pilot Drilled Φ80 together with the Stub Shaft (To be finally reamed to Φ82,55 (3 1 /4
xNQ_ą \4 D4Ĉ LڰJ)-?XTHKQjioC3+^33ƕ&&{7o"QTךع͵tl`ػX!=0Lv/) e`0$\$Yڷn<ˌ8 %q7701wPYi_ G{;aAU@ TgHpT5~'~U8,\"쐗9>~>wVYO 2WS {?xFx>_Di"*4զtH0mZ2 B\A1:)I-+~aM; OX L2-4t_$DЁ)pA8U5i>r;IeɘAԡj!E7mrrQ(Ed|̠ؓA1gxpa4%)w!LSzcjt 7-鸨qr c,FFUJ D?ɞ_qj/ƶe-sᬾ˫'5CWb1_YsؽUr=`|yWxP d7!/8Y&R;b|:sTps{y{x80yt޵̱_א̷lv1'^ۋ%^秳Vm矋t`ܼ]wEWR3'dߪ5xjW#9jf b„fЎ+GD}x喿

英语翻译打问号的是看不清楚的.12 Holes equispaced to be Pilot Drilled Φ80 together with the Stub Shaft (To be finally reamed to Φ82,55 (3 1 /4") on site assy.)Notes:1.Surface finish (中间是数字)all over &(数字)w?ere show
英语翻译
打问号的是看不清楚的.
12 Holes equispaced to be Pilot Drilled Φ80 together with the Stub Shaft (To be finally reamed to Φ82,55 (3 1 /4") on site assy.)
Notes:
1.Surface finish (中间是数字)all over &(数字)w?ere shown
No tool marks permitted on Shaft &Stub Shaft.
2.All Radii to be (数字) &Free From Tool Marks or undercuts.
3.Break all sharp corners.
4.Quality Status - Critical.
5.Q.C.P.Allocated.
6.Shaft details taken from FH&B Drawing for N'Kana
Rock Hoist (S.O.B.Shaft )Ref.No.8-58-90

英语翻译打问号的是看不清楚的.12 Holes equispaced to be Pilot Drilled Φ80 together with the Stub Shaft (To be finally reamed to Φ82,55 (3 1 /4") on site assy.)Notes:1.Surface finish (中间是数字)all over &(数字)w?ere show
我给你翻译一下:12孔钻等是飞行员一起Φ80短轴盘(最后对Φ82,33(3个1 / 4”)现场组装.)
注:
1.表面处理(w)?之前,显示
不允许在&Stub工具标志轴轴上.
2.所有被推崇工具半径从标志或者削弱.
3.打破所有的急转弯.
4.质量的身份地位——至关重要.
Q.C.P 5..分配.
6.来自FH&B轴细节氮'Kana图纸
岩石葫芦(s.o.b.轴)参考.8-58-90号,