高分请达人翻译几句话,谢绝机器一、 综合布线:在敷设过程中根据敷设线缆的数量确定敷设的管径,1~2根双绞线:SC20 CC,WC,FC;3~4根双绞线:SC25 CC,WC,FC.二、 门禁系统:控制器与控制器之间采用

来源:学生作业帮助网 编辑:作业帮 时间:2024/07/17 11:09:26
高分请达人翻译几句话,谢绝机器一、 综合布线:在敷设过程中根据敷设线缆的数量确定敷设的管径,1~2根双绞线:SC20 CC,WC,FC;3~4根双绞线:SC25 CC,WC,FC.二、 门禁系统:控制器与控制器之间采用
xV[OF+2fDhDۇJ$"^V B)ᲀdز;O=c;ĹTj$3;geodޚժը$}Hyb/>ݫYNO!V'다ª69W[%nB,aFXc\n]6Y蜜缩\:?")n0U;C q߆g#woFY]atκYZinif!Ni \lt)C3K;i&k9BYq@yM`qD%x'[VwUs_OM=~0?DjFF`yyxzЍC׎uyQdw9 >n-'>[homO;4lO8d\#?.]!sf-o0d5+Qܸ~^3n[-٥k\p0>3oCְ! hF$ezP Q&"$cV#U`!lV ɘES$Y6aYԑ8 $E7,cCRԈ02f$cIӻF# 6̋a%"ςCl jpKE"0,. A.QU`p,(bwCSeYt $停^̦K =UL2X 㘕WxdФLO?.s.,v,=6`1TNU[X2Σ|LU$gmL,ϻ$j@:}pX}&‘)!cmѰ& P%CKD&Z/ًPG2spPceܣ~.rl-O~mIa_WfMN@<\`SNᘚP^y4zL -rh=Go3B`(\T7O;_h([/&E֙Pux

高分请达人翻译几句话,谢绝机器一、 综合布线:在敷设过程中根据敷设线缆的数量确定敷设的管径,1~2根双绞线:SC20 CC,WC,FC;3~4根双绞线:SC25 CC,WC,FC.二、 门禁系统:控制器与控制器之间采用
高分请达人翻译几句话,谢绝机器
一、 综合布线:在敷设过程中根据敷设线缆的数量确定敷设的管径,1~2根双绞线:SC20 CC,WC,FC;3~4根双绞线:SC25 CC,WC,FC.
二、 门禁系统:控制器与控制器之间采用手拉手485总线方式连接,电源线与信号线单独穿管,RVVPS2*1.0 SC20 RVV2*1.0 SC20 CC,WC.
三、 报警系统:连接探测器线缆电源线与信号线单独穿管,RVV2*1.0 SC20 CC.
四、 监控系统:电源线RVV2*1.0与视频线SYV75-5单独穿管,SC20 CC.
五、 在主干线路中,以上系统共用桥架.
翻译得好,有跟分送

高分请达人翻译几句话,谢绝机器一、 综合布线:在敷设过程中根据敷设线缆的数量确定敷设的管径,1~2根双绞线:SC20 CC,WC,FC;3~4根双绞线:SC25 CC,WC,FC.二、 门禁系统:控制器与控制器之间采用
1.integrated wiring:to determine the tube diameter according to the quantity of laying cables in the installation process,1-2 twisted pairs:SC20 CC,WC,FC; 3-4 twisted pairs:SC25 CC,WC,FC.
2.entrance guard system:adopt the “hand in hand” bus method of 485 to connect the controllers,the power wires and the signal wires should be laid in conduits separately,RVVPS2*1.0 SC20 RVV2*1.0 SC20 CC,WC.
3.Alarm System:the signal wires and the power wires connecting the cable of the detector should be laid in one conduit,RVV2 * 1.0 SC20 CC.
4.monitoring system:the power wire of RVV2 * 1.0 and the video cable of SYV75-5 should be laid in one conduit,SC20 CC.
5.the above mentioned systems share the bridge structure in the main trunk line

好专业啊。。。等待高人。

天书啊

First. Integrated wiring: In the installation process to determine the amount according to the laying of cables laying diameter, 1 ~ 2 twisted pair: SC20 CC, WC, FC; 3 ~ 4 Gen UTP: SC25 CC, WC, FC.

全部展开

First. Integrated wiring: In the installation process to determine the amount according to the laying of cables laying diameter, 1 ~ 2 twisted pair: SC20 CC, WC, FC; 3 ~ 4 Gen UTP: SC25 CC, WC, FC.
Second. Access control system: controller and between controller 485 connected with Hand in Hand, power lines and signal lines separately to wear tube, RVVPS2 * 1.0 SC20 RVV2 * 1.0 SC20 CC, WC.
Third. Alarm System: Connect the power line and cable detector signal line alone wear tube, RVV2 * 1.0 SC20 CC.
Forth. Monitoring systems: the power cord RVV2 * 1.0 and video cable SYV75-5 alone wearing a tube, SC20 CC.
Fifth. In the trunk lines, the above system shared bridge.

收起

不好意思,水平有限,弄不出来,在此关注高手的答案,多多学习一下,请勿见怪同样鄙视机器!

高分请达人翻译几句话,谢绝机器一、 综合布线:在敷设过程中根据敷设线缆的数量确定敷设的管径,1~2根双绞线:SC20 CC,WC,FC;3~4根双绞线:SC25 CC,WC,FC.二、 门禁系统:控制器与控制器之间采用 英语翻译如题请翻译谢绝机器 请帮偶翻译一句,谢绝机器今天又忙得跟打仗一样 职业有分工,身份无贵贱,这句话怎么翻译成英文?谢绝翻译机器的答案 英语翻译“磨练中成长”怎么翻译?(谢绝机器)谢谢! 英语翻译如题请翻译,谢绝机器,提出宝贵意见者得分 请翻译一句话,谢绝机器.The one that got away 英语翻译如题请翻译“新疆德威龙配送中心总经销”谢绝机器 请帮忙翻译几句话,要标准啊(高分在线等)三年级(2)班德育副校长室教学副校长室小学教务处做门牌用的,一定要标准,不要机器的,谢了 英语翻译谢绝机器 麻烦翻译下这句话,谢绝机器,谢谢!他们的价格也是在我公司拿的.也是通过我公司运输. 英语翻译请用英语翻译这句话,谢绝机器的翻译:客户到现在还没任何反馈,我认为可以关闭这个项目. 几句英语,谢绝用机器,支持手工.鄙视机器.尊重劳动者产品颜色:3个颜色色如图 货物齐全 谢绝留言,请翻译,标准点,拒绝机器英语与中国式英语 英语翻译如题怎样翻译为好,谢绝机器,提出宝贵意见者得分 翻译:pancake and syrup谢绝机器,对于真诚的回答者,表示感谢 英语翻译如题怎样翻译更好,谢绝机器,提出宝贵意见者得分 请好心人帮我翻译这句话,机器的谢绝As you can see we have changed our specifictions to benefit your company in filling these last remaining contracts and also raised the freight allowance by500dollars.